Renewable Energy
The ability to create renewable energy has become critical in addressing world environmental issues. This industry is quickly becoming an integral part in helping to protect our environment and provide alternatives to the increasing costs and emissions related to the majority of our current power production.
FCM believes in being good stewards to the earth and we are proud to be part of the movement to create energy in ways that doesn’t impact our environment. This will create a cleaner and cheaper alternative for future generations. With the new push for alternative energy resources, we have been fortunate to be chosen to provide project management as well as full service installation services for a number of high profile photovoltaic solar projects. Following is a list of some of the projects we have been involved with:
Commercial Photovoltaic
IKEA Savannah
Savannah, GA, DC photovoltaic (PV) system with 6,076 (1,458 kW) Yingli YL 240-P-29b 240 Watt modules, PanelClaw Polar Bear roof mounting at 10 degrees and two Solaron inverters on a three phase service. System was installed on an existing distribution warehouse roof as part of IKEA’s national program to become more environmentally friendly. Modules were installed on a TPO roof. Power is fed back to the grid through a buy back program with Georgia Power. Installation of racking, modules inner-module string wiring, home run wiring and wire management was completed in seven weeks. Electrical system was completed by Client.
IKEA Atlanta
Atlanta, GA, DC photovoltaic (PV) system with 4,312 (1,035 kW) Yingli YL 240-P-29b 240 Watt modules, PanelClaw Grizzly Bear roof mounting at 10 degrees and two Solaron inverters on a three phase service. System was installed on an existing retail warehouse roof as part of IKEA’s national program to become more environmentally friendly. Modules were installed on a TPO roof. Power is fed back to the grid through a buy back program with Georgia Power. Installation of racking, modules inner-module string wiring and wire management was completed in five weeks. Electrical system was completed by Client.
Green Square Parking Deck
Raleigh, NC, DC photovoltaic (PV) system with 957 (249 kW) American Solar Wholesale ASW-260P 260 watt modules, structurally integrated racking at a 10 degree tilt and a SMA inverter on a three phase service. System was installed on an existing parking garage. Work had to be performed at night during off peak hours. The system is tied to the grid. Interconnection required shutting down an entire city block and substantial coordination with the power company and state agencies that occupy the affected buildings. Installation of entire system was completed over four weeks.
EOD Addition 2nd Marine Logistics Group, Camp Lejeune, NC
Jacksonville, NC, DC photovoltaic (PV) system with 319 (45.9 kW) Unisolar PVL144 modules mounted to a standing seam roof, and a Satcon 50 kW inverter on a three phase service. System was installed on a new EOD Vehicle Maintenance Facility being constructed by Joyce and Associates at the military base. Installation of entire system had to be closely coordinated with multiple trades and was completed over two weeks.
New River Fitness Center, Camp Lejeune, NC
Jacksonville, NC, DC photovoltaic (PV) system with 240 (62.4 kW) American Solar Wholesale ASW-260P 260 watt modules mounted to a standing seam roof with S-5 clamps and module clips, and two Satcon 30 kW inverters on a three phase service. System was installed on a new fitness center being constructed by Whiting-Turner at the military base. Installation of entire system had to be closely coordinated with multiple trades and was completed over two weeks.
Army Reserve Center
Denton, TX, DC photovoltaic (PV) system with 33 (8.3 kW) Suniva ART 250-60 250 watt modules, Silverback Solar Frame Mounting, and three PVP 2500 string inverters on a three phase service. System was installed on an Army Reserve Center being constructed by McCarthy Construction. Installation was on a flat TPO roof and was completed in two days.
American Peanut Growers Group, LLC
Donalsonville, GA, DC photovoltaic (PV) system with 1,736 (400 kW) Suniva ART 230-60 230 watt modules, Unirac SolarMount mounting and KACO inverters on a three phase service. System was installed on five existing metal canopies at an existing peanut processing facility. At the time of installation it was the largest roof mounted solar array in Georgia. Power is fed back to the grid. Installation of racking and modules was completed in twelve days. Electrical system was completed by Client.
Hawkins County Schools, Church Hill Middle School
Church Hill, TN, DC photovoltaic (PV) system with 789 (200 kW) Siliken SLK60P6L 250 watt modules, 691 panels installed on PanelClaw Grizzly Bear roof mounting at 10 degrees and 98 panels installed on Unirac SolarMount mounting mechanically attached to a standing seam roof with S-5 Clamps, and two 100 kW PV Powered inverters on a three phase service. System was installed on an existing middle school as part of a three phase project. Modules had to be installed while classes were in session and through close coordination with the school. The racking and panel installation was completed in four days with no interruptions to school operations. Power is fed back to the grid as part of the TVA program. Electrical system was completed by Client.
Hawkins County Schools, Bulls Gap School
Bulls Gap, TN, DC photovoltaic (PV) system with 406 (100 kW) Siliken SLK60P6L 245 watt modules, installed on PanelClaw Grizzly Bear roof mounting at 10 degrees, and one 100 kW PV Powered inverter on a three phase service. System was installed on an existing school as part of a three phase project. Modules had to be installed while classes were in session and through close coordination with the school. The racking and panel installation was completed in three days with no interruptions to school operations. Power is fed back to the grid as part of the TVA program. Electrical system was completed by Client.
Hawkins County Schools, Clinch K-12 School
Sneedville, TN, DC photovoltaic (PV) system with 392 (100 kW) Siliken SLK60P6L 250 watt modules, installed on PanelClaw Grizzly Bear roof mounting at 10 degrees, and one 100 kW PV Powered inverter on a three phase service. System was installed on an existing school as part of a three phase project. Modules had to be installed while classes were in session and through close coordination with the school. The racking and panel installation was completed in three days with no interruptions to school operations. Power is fed back to the grid as part of the TVA program. Electrical system was completed by Client.
HP Data Center
Suwanee, GA, DC photovoltaic (PV) system with 1,417 (347 kW) Suniva ART 245-60 245 watt modules, PanelClaw Grizzly Bear roof mounting at 10 degrees and a PV Powered inverter on a three phase service. System was installed on an existing data center roof as part of a facility upgrade by Holder Construction. Modules were installed on a modified roof. Power is utilized directly by building owner to reduce energy costs. Installation of racking and modules was completed in five days. Electrical system was completed by Client.
Greg Calhoun Farm
Bainbridge, GA, DC photovoltaic (PV) system with 798 (200 kW) Siliken SLK60P6L 250 watt modules, Daetwyler Eco Top roof mounting at 10 degrees mounted on Schletter Fix 2000 trapezoidal clamps and two PV Powered inverters on a three phase service. System was installed on an existing food cooler facility on a metal roof. Installation of racking and modules was completed in seven days. Electrical system was completed by Client.
Dollar Farm
Bainbridge, GA, DC photovoltaic (PV) system with 192 (48 kW) Siliken SLK60P6L 250 watt modules, Schletter FixZ-7 and Renusol VS roof mounting systems and a Fronius central inverter on a three phase service. System was installed on an existing farm retail facility on a metal roof. Installation of racking and modules was completed in three days. Electrical system was completed by Client.
H&H Farm
Calhoun, GA, DC photovoltaic (PV) system with 816 (200 kW) S-Energy SM-XXXPC8 245 watt modules, Jac-Rack ground mounting and Xantrex inverters on a three phase service. Installation involved coordination of tie-in of a new three phase service with local utility. Project was completed in a total of two weeks for racking, module and electrical installation. Power is fed back to the grid as part of the TVA program.
H&H Farm
Calhoun, GA, DC photovoltaic (PV) system with 1,080 (238 kW) Schuco MPE 220 PS09 modules, Jac-Rack ground mounting and a PVPowered inverter on a three phase service. Installation involved coordination of routing a new three phase service with local utility. Project was completed in a total of one month for racking, module and electrical installation. Power is fed back to the grid as part of the TVA program.
Sterling Planet
Valdosta, GA, DC photovoltaic (PV) system with 1,056 (232 kW) Schuco MPE 220 PS09 modules, Jac-Rack ground mounting and PVPowered inverters on a three phase service. Installation involved substantial primary line electrical work to tie-in the inverters. Three separate inverters had to be utilized to comply with GA Power specifications. Site was graded and rocked to reduce required maintenance. Project was completed on an expedited schedule in a total of three weeks from grading to completion of electrical work. Racking and modules were installed in four days. Power is fed back to the grid.
Peachtree 25th
Atlanta, GA, DC photovoltaic (PV) system with 663 (146 kW) Schuco MPE 220 PS09 modules, Schuco ezFlatRoof 2.0 mounting at 7.5 degrees and PVPowered inverters on a three phase service. Installation involved substantial coordination with building owner and cellular providers with roof top antennas. System had to be designed and installed around roof mounted conduit and various building equipment. A number of work shutdowns occurred throughout the project to coordinate relocation of equipment with other vendors. Due to the height of the building, a typical ballasted system was not sufficient. Instead, a roof mounted post and cable system was installed. All materials were lifted by crane and inverters had to be manually set in place. Work took place over 40 days due to substantial coordination with building vendors and GA Power. Actual work was completed in 28 days. Power is utilized directly by building owner to reduce energy costs.
Arkansas National Wildlife Refuge Buildings
Bald Knob NWR, Bald Knob, AR; Wapanocca NWR, Turrell, AR; Big Lake NWR, Manila, AR; DC photovoltaic (PV) system using a total of 58 (14.2 kW) Siliken SLK60P6L 245 watt modules, Unirac SolarMount mounting attached with S-5 clamps to a standing seam roof and Fronius inverters on a single phase service.
Lanier Tech Forsyth
Cumming, GA, DC photovoltaic (PV) systems. Ballasted roof system includes 78 (19 kW) Suniva ART 245-60 245 watt modules, Rayport AET-430 Stainless Steel Roof Ballast Racking and SMA inverters on a three phase service. A canopy was constructed for support of 12 (2.9 kW) Suniva ART 245-60 245 watt modules with Unirac SolarMount mounting and SMA inverters on a three phase service. An Array Technologies Wattsun Solar Tracker Model #AZ-225 dual access tracker with 12 (2.9 kW) Suniva ART 245-60 245 watt modules and SMA inverters on a three phase service was installed. Finally, 2 (0.5 kW) Suniva ART 245-60 245 watt modules, Rayport AET-430 Stainless Steel Roof Ballast Racking and SMA inverters on a three phase service were installed with a DEKA VRI-Gel Battery 8G31-DEKA battery back up to power site lighting. Fischer Contractors was responsible for all construction including concrete, work, structural steel and standing seam for canopies, benches, dual access tracker and electrical work. Systems were installed as part of the new technical training being offered by the school for the solar industry and will be used in educating future solar professionals. Power is fed back to the grid.
Lanier Tech Oakwood
Oakwood, GA, DC photovoltaic (PV) systems. Ballasted roof system includes 65 (15.9 kW) Suniva ART 245-60 245 watt modules and 44 (5.6 kW) Sharp NA-V128H1 128 watt thin film modules, Rayport AET-430 Stainless Steel Roof Ballast Racking and SMA inverters on a three phase service. A canopy was constructed for support of 12 (2.9 kW) Suniva ART 245-60 245 watt modules with Unirac SolarMount mounting and SMA inverters on a three phase service. An Array Technologies Wattsun Solar Tracker Model #AZ-225 dual access tracker with 12 (2.9 kW) Suniva ART 245-60 245 watt modules and SMA inverters on a three phase service was installed. Finally, 3 (0.7 kW) Suniva ART 245-60 245 watt modules, Rayport AET-430 Stainless Steel Roof Ballast Racking and SMA inverters on a three phase service were installed with a DEKA VRI-Gel Battery 8G31-DEKA battery back up to power site lighting. Fischer Contractors was responsible for all construction including concrete, work, structural steel and standing seam for canopies, dual access tracker and electrical work. Systems were installed as part of the new technical training being offered by the school for the solar industry and will be used in educating future solar professionals. Power is fed back to the grid.
REI Kennesaw
Kennesaw, GA, DC photovoltaic (PV) system with 434 (97 kW) Sharp ND-224UCJ 224 watt modules, Sunlink mechanically fastened roof mounting at 10 degrees and a PV Powered inverter on a three phase service. System was installed on an existing REI retail store. System included installation of 85 mechanically fastened posts to the existing rock ballasted roof deck. Power is utilized directly by building owner to reduce energy costs. Installation of racking and modules was completed in seven days. Electrical system was completed by Client.
Jekyll Island Convention Center
Jekyll Island, GA, DC photovoltaic (PV) system with 40 (7.8 kW) Sanyo HIT Double 195 bifacial 195 watt modules mounted in existing canopies designed for photovoltaic module installation and Fronius inverters on a three phase service. System was installed during construction of the convention center by Brassfield Gorrie in a canopy constructed for module installation. Modules integrated with canopy provide a waterproof canopy for the new convention center. Power is utilized directly by building owner to reduce energy costs. Installation of entire system had to be closely coordinated with multiple trades and was completed over one week.
Athens Multi-Modal Facility
Athens, GA, DC photovoltaic (PV) system with 120 (16 kW) Uni-Solar PVL 136 thin film laminated modules and a Solectria PVI inverter on a three phase service. System was installed on a new transportation facility at the University of Georgia campus which serves both bus and train traffic. Modules were installed on a metal roof. Power is fed back to the grid. Installation was completed in two days.
4th Ward, Beltline Project
Atlanta, GA, DC photovoltaic (PV) system using 130 (31 kW) Suniva ART 245-60 240 watt modules, Schletter IsoTop mounting and Fronius inverters on a three phase service. Project is part of a revitalization of a skate park with state of the art skate board facilities in the heart of Atlanta. Modules were installed on an elevated structural steel platform. Installation was completed in two days.
DH Stanton Park, Beltline Project
Atlanta, GA, DC photovoltaic (PV) system using 88 (21 kW) Suniva ART 245-60 240 watt modules, Schletter IsoTop mounting and Fronius inverters on a three phase service.Project was featured on local news for being one of the first parks in the nation to receive a renewable energy system. Installation was completed in a park for inner city children on the Atlanta Beltline project. Modules were installed on an elevated structural steel platform. Installation was completed in four days.
Cooper Organic
La Fayette, GA, DC photovoltaic (PV) system with 196 (50 kW) Siliken SLK60P6L 250 watt modules, Schletter FS ground mounting at 15 degrees and SMA inverters on a single phase service. Project was installed on a sloped grade with posts augered and placed in concrete with Schletter system attached to posts they provided. System ties into the main grid and is part of the TVA buy back program. Construction and installation was completed over a four day period. Electrical system was completed by Client.
Glenn Heard Farm
Brinson, GA, DC photovoltaic (PV) system racking. Responsible for the installation of Solar FlexRack racking for a 100 kW system. Project was installed at an operating farm on helical piles. Racking system was installed in two days. Paneling and electrical system were completed by Client.
Flint River Nursery
Byromville, GA, DC photovoltaic (PV) system racking. Responsible for the installation of Schletter FS ground mounted racking at 15 degrees for a 40 kW system. Project was installed at a nursery on concrete encased piles. Footings, posts and racking system were installed in three days. Paneling and electrical system were completed by Client.
Hendrix Farm
Madison, GA, DC photovoltaic (PV) system with 126 (31 kW) Suniva ART 245-60 245 watt modules, Unirac SolarMount mounting and Fronius inverters on a single phase service. System was installed on a Client constructed solar barn. Power is utilized directly by building owner to reduce energy costs. Installation was completed in two days.
Quarterman
Hahira, GA, DC photovoltaic (PV) system with 60 (13.8 kW) Sharp ND-U230C1 230 watt modules, Unirac SolarMount mounting and Fronius inverters on a single phase service. System was installed on an existing metal building. Power is utilized directly by building owner to reduce energy costs. Installation was completed in two days.
Atapco Office Building – Newark, DE
Newark, DE, DC photovoltaic (PV) system with 528 (100 kW) Mage 5MI 190 watt modules, Solar FlexRack ballasted roof mounting at 14 degrees and Satcon inverter on a three phase service. Installation involved substantial coordination with building Owner for roof loading and material staging. System was designed and installed on a rock ballasted roof around numerous existing roof top penetrations and air handling units. All materials were lifted by crane and inverter was placed in an interior electrical room. Work took place over 6 days. Power is utilized directly by building owner to reduce energy costs.
Hertz Equipment Rental
Norcross, GA, DC photovoltaic (PV) system with 308 (72.4 kW) Hanwha SolarOne SF-220-30 235P 235 watt modules, PanelClaw Grizzly Bear roof mounting at 10 degrees and PV Powered inverter on a three phase service. Install involved installation of racking and modules on a TPO roof. Electrical system was installed by Client. Work took place over 2 days. Power is net metered with local utility.
Hertz Equipment Rental
Macon, GA, DC photovoltaic (PV) system with 273 (64.1 kW) Solarfun SF-220-30-P 235 watt modules, Unirac SolarMount mounting and PVPowered inverter on a three phase service. Install involved installation of racking, modules, concrete pad, inverter and electrical equipment for an existing rental facility. Work took place over 4 days. Power is net metered with local utility.
Hertz Equipment Rental
Augusta, GA, DC photovoltaic (PV) system with 300 (70.5 kW) Solarfun SF-220-30-P 235 watt modules, Unirac SolarMount mounting and PVPowered inverter on a three phase service. Install involved installation of racking, modules, concrete pad, inverter and electrical equipment for an existing rental facility. Work took place over 4 days. Power is net metered with local utility.
Down to Earth Energy
Monroe, GA, DC photovoltaic (PV) system with 468 (110 kW) Schuco MPE 235 PS09 modules, Unirac SolarMount mounting and a PVPowered inverter on a three phase service. System was installed on three separate solar barns. Two barns each have 126 modules and the third has 216 modules. Solar barns were constructed at an existing bio diesel production facility. Power is fed back to the grid. Installation was completed in six days.
Spectra
Antioch, TN, DC photovoltaic (PV) system with 130 (30 kW) Schuco MPE 230 PS09 modules, Schuco ezFlatRoof 2.0 mounting at 15 degrees attached with S-5 clamps to a standing seam roof and a PVPowered inverter on a three phase service. System was attached to standing seam roof with S-5 clamps to eliminate the need for ballasting and modifications to the roof structure. Power is fed back to the grid. Installation was completed in two days.
800 Main
Nashville, TN, DC photovoltaic (PV) system with 130 (30 kW) Schuco MPE 235 PS09 modules, Schuco ezFlatRoof 2.0 mounting at 15 degrees and a PVPowered inverter on a three phase service. System is a ballasted system and power feeds back to the grid. Installation was on a rock ballasted rubber membrane roof. Ballasted rock had to be removed for racking placement then replaced. Installation was completed in two days.
Check Velocity
Nashville, TN, DC photovoltaic (PV) system with 105 (25 kW) Grape Solar GS-S-240-CS modules, Schuco ezFlatRoof 2.0 mounting at 15 degrees and Fronius inverters on a three phase service. Installation is on an historical building in downtown Nashville with significant changes in roof pitch which could not be modified. System is a ballasted system and power feeds back to the grid. Installation was completed in two days.
Waynesboro
Waynesboro, GA, DC photovoltaic (PV) system with 250 (58 kW) Solon Black 230/01 modules, Unirac SolarMount mounting and Fronius inverters on a three phase service.Installation took place during the renovation of a historical building and construction of two new buildings for an assisted care living center. Installation took three days with intermittent delays due to weather. Power is fed back to the grid.
Woods Bed & Breakfast and Farms
Rising Fawn, GA, DC photovoltaic (PV) systems. Bed & Breakfast included 50 (11 kW) Schuco MPE 220 PS09 modules, Unirac SolarMount mounting and Fronius inverters on a single phase service. Two separate farms each consisted of 60 (13 kW) Schuco MPE 220 PS09 modules, Power-Fab Top of Pole mounting and Fronius inverters on a three phase service. The Bed & Breakfast installation consisted of the construction of a pergola to support the 50 modules installed. Farm installation consisted of installing five each 10″ posts 12′ below grade for the support of the racking system and modules. Substantial underground electrical work was required to complete tie-in to the local utility. Racking and module installation was completed in three days. Electrical work was completed in five days. Power is fed back to the grid.
Haven Farms
Calhoun, GA, DC photovoltaic (PV) system with 458 (101 kW) Schuco MPE 220 PS09 modules, Schletter FS ground mounting at 15 degrees and SMA inverters on a single phase service. One of the largest ground mounted solar installations in Georgia at the time of installation. System ties into the main grid which is managed by the TVA in cooperation with North Georgia EMC. Site was graded and rocked to reduce required maintenance. Constructed an inverter shed for housing of the SMA inverters. Construction and installation was completed over a three week period.
White Oaks
Bluffton, GA, photovoltaic (PV) system with 216 (49 kW) Siliken 225 PL60 modules, Schletter IsoTop mounting and SMA inverters on a three phase service. At the time of installation in May 2010, this was the largest solar barn in the southeastern United States. Complete installation and power up was completed in four days. Power generated is fed back to the grid.
Montessori School
Covington, GA, DC photovoltaic (PV) system using 30 (7.2 kW) Suniva ART 245-60 240 watt modules, Unirac SolarMount mounting and Fronius inverters on a three phase service. Installation included substantial electrical work within the school while classes were taking place. Racking, module and electrical installation was able to take place without any disruption to classes and was completed in three days.
Raphael Street Retail
Covington, GA, DC photovoltaic (PV) system using 39 (9.4 kW) Suniva ART 245-60 240 watt modules, Solar Dock ballasted mounting and Fronius inverters on a single phase service. Installation was for a mixed use facility housing ground floor retail and a community residence for aspiring architects from the University of Georgia. Racking, module and electrical installation was completed in three days.
Clark’s Grove HOA
Covington, GA, DC photovoltaic (PV) system using 39 (9.4 kW) Suniva ART 245-60 240 watt modules, Schletter IsoTop mounting and Fronius inverters on a single phase service. Installation was made at the community clubhouse on top of a shade pergola for the pool area. The electricity generated ties back into the communal street lighting and powers the clubhouse and common areas. Racking, module and electrical installation was completed in two days.
Halstead New England Warehouse
Calhoun, GA, DC photovoltaic (PV) system using 117 (28 kW) Suniva ART 245-60 240 watt modules, Unirac SolarMount mounting and Fronius inverters on a three phase service. The installation supplies electricity to service a new LEED Platinum call center adjacent to the property. The facility will draw 25% of its electricity needs from the solar array. Installation was completed on a fast track schedule in one day.
Residential Photovoltaic
Toraya Residence
Atlanta, GA, DC photovoltaic (PV) system using a Mage prepackaged Austin Kit system consisting of 21 (4.8 kW) Mage Powertec Plus 230/6PI 230 watt modules, a Mage rail roof mounting system on Flat Jack roof mounts and Solar Edge DC/DC optimizers and a Solar Edge Inverter on a three phase service.
Robinson Farm
Rockmart, GA, DC photovoltaic (PV) system using 39 (7.4 kW) Mage 5MI 190 watt modules, Unirac SolarMount mounting and SMA inverter on a single phase service.
Morgan Residence
Thomaston, GA, DC photovoltaic (PV) system using 43 (10.3 kW) Suniva ART 245-60 240 watt modules, Unirac SolarMount mounting attached with S-5 clamps to a standing seam roof and Fronius inverters on a single phase service.
547 Candler Street
547 Candler Street, Atlanta, GA, DC photovoltaic (PV) system using 20 (4.8 kW) Suniva ART 245-60 240 watt modules, Unirac SolarMount mounting and PVPowered inverters on a single phase service.
Stoddart Home
Cumming, GA, DC photovoltaic (PV) system using 30 (7.2 kW) Suniva ART 245-60 240 watt modules, Unirac SolarMount mounting and InPhase Energy inverters on a single phase service.
182 Degress Avenue
Atlanta, GA, DC photovoltaic (PV) system using 12 (2.9 kW) Suniva ART 245-60 240 watt modules, Unirac SolarMount mounting and Fronius inverters on a single phase service.
Commercial Solar Thermal
New River Fitness Center, Camp Lejeune, NC
Jacksonville, NC, Passive Solar Thermal system with 10 TCT PT-50-CN Solar Collectors, mechanically fastened TCT mounting system on S-5 Clamps attached to a standing seam roof at a 37 degree tilt with plumbing tied into previously installed hot water heater in mechanical room producing 0.29 MMBTU (million BTU) per day. System was installed on a new fitness center being constructed by Whiting-Turner at the military base. Racking had to be field modified and reinforced per Fischer Contractors’ recommended design modifications. Installation of entire system had to be closely coordinated with multiple trades and was completed over two weeks.
Cleveland County Detention Facility
Shelby, NC, Active Solar Thermal system with 80 Wagner Euro C20 Collectors, ballasted Wagner EURO L20 MQ TRIC F racking at a 37 degree tilt and two storage tanks, 3,000 gallons and 534 gallons producing 1.84 MMBTU (million BTU) per day. System was installed on an existing detention facility on a built up roof. System is a ballasted system integrated into the racking. System is used for providing hot water to the prison population. Installation of entire system was completed over four weeks.
Pitt County Detention Center
Greenville, NC, Active Solar Thermal system with 77 Wagner Euro C20 Collectors, mechanically fastened Wagner EURO L20 MQ TRIC F racking system at a 45 degree tilt and one 3,000 gallon storage tank producing 1.77 MMBTU (million BTU) per day. System was installed on an existing detention facility on a rock ballasted roof. System is mechanically fastened to the existing concrete roof with 124 metal posts. System is used for providing hot water to the prison population. Installation of entire system was completed over four weeks.